Tinggalkan pesan
Kami akan segera menghubungi Anda kembali!
Pesan Anda harus antara 20-3.000 karakter!
Silakan periksa email Anda!
Lebih banyak informasi memfasilitasi komunikasi yang lebih baik.
Berhasil dikirim!
Kami akan segera menghubungi Anda kembali!
Tinggalkan pesan
Kami akan segera menghubungi Anda kembali!
Pesan Anda harus antara 20-3.000 karakter!
Silakan periksa email Anda!
—— Moyo
—— Octavio
—— Cristian
—— Tempat menyimpan bahan makanan
—— Samuel
—— Ali
(1) According to the factory list of the tile press, check whether the tile press and accessories are complete, whether there are bumps and damage during transportation, and if missing parts or damage are found, they should be immediately submitted to the manufacturer or the transporter.
(2) According to the instruction manual of the machine, understand the structure, components and mutual relationship of the installed tile press.
(3) Determine the installation location of the tile press according to the plant conditions and construction drawings.
(4) According to the foundation drawing of the tile press, pour the concrete foundation, pay special attention to the elevation of the foundation and the position of the reserved holes of the anchor bolts during construction.
After completing the above points, the tile press equipment can be used after it is fixed. If you have other questions you want to know, please contact our factory.